WSUTech Snap-on Lab Renovation @ East High School
Charging Forward with an Electrified Auto Program
Wichita, KS
The automotive industry’s rapid shift toward electric vehicles demands a new generation of skilled technicians. WSU Tech recognized this critical need and embarked on a comprehensive renovation to transform their traditional auto mechanics lab into a cutting-edge electric vehicle training facility.
This 12,000 SF renovation project represented more than just a physical transformation – it signaled a fundamental shift in technical education. The existing auto mechanics lab, which had served students learning conventional vehicle repair for years, needed to evolve to meet tomorrow’s workforce demands. The renovation converted the traditional space into a modern facility capable of training students on both electric vehicles and hybrid buses that combine diesel and electric systems.
The project scope extended far beyond simple equipment updates. We completely reimagined the space, converting paint booth areas into 14 new training bays where students could work hands-on with electric vehicle technology. The renovation included new classroom space to support theoretical learning alongside practical application, updated restrooms, and enhanced building systems designed specifically for electric vehicle training requirements.
One of the most visible changes involved the building’s exterior transformation. We installed a new brick facade around most of the building’s perimeter and added modern glass overhead doors that provide both functionality and an updated aesthetic. Several existing bays were bricked and blocked to create the optimal configuration for the new training program.
The technical requirements for electric vehicle training presented unique challenges. Unlike traditional auto repair spaces, this facility needed specialized vehicle exhaust systems and infrastructure capable of supporting hybrid buses that operate on both diesel and electric power. These systems required careful integration to ensure student safety while providing realistic training environments.
The project faced significant challenges that tested our problem-solving abilities. A communication gap between the architect, fire department, and fire marshal’s office led to complications when we removed the building’s fire suppression system as part of the renovation. The building department failed to properly coordinate the plan changes with the fire marshal, resulting in a work stoppage that required immediate resolution.
Perhaps more dramatically, the building suffered flood damage during construction when another contractor working on a separate roofing project failed to properly weather-seal their work. The resulting water infiltration required swift action to protect the ongoing renovation work and maintain the project timeline.
These challenges reinforced the importance of comprehensive coordination, especially when multiple contractors work on the same facility. Our team adapted quickly to both situations, working closely with all parties to resolve issues and keep the project moving forward.
The six-month timeline allowed WSU Tech to have their new facility operational for the fall semester. Students now train in a modern environment that reflects current industry standards and prepares them for careers in the evolving automotive sector.
This renovation creates pathways for students who might not pursue traditional four-year degrees but can build rewarding careers in the skilled trades. The electric vehicle training program addresses a critical workforce need while providing students with marketable skills in a growing field.
Project Facts
Industry Sector: Educational
Cost: $1,594,635
Size: 12,000 SF
Delivery Method: Design-Bid-Build / Hard Bid
Self-Perform: Demo
Owner: WSU Tech
Architect: Tessere, Inc
Engineer: Professional Engineering Consultants, P.A.