
Lake Dallas HS Fine Arts Renovation
Where Creativity Meets Craft
Corinth, TX
The transformation of Lake Dallas High School’s fine arts and career technical education (CTE) facilities represents a significant investment in student creativity and career readiness. This comprehensive renovation and addition project reimagined educational spaces across the entire campus, creating modern environments where students can explore artistic expression and develop technical skills essential for tomorrow’s workforce.
What sets this project apart is the careful balance between preserving the school’s existing character while introducing state-of-the-art facilities. The renovation touched multiple areas throughout the 182,000 SF campus, requiring meticulous coordination to maintain school operations while construction progressed. The team navigated the complexities of working in an active educational environment, ensuring minimal disruption to daily learning activities.
The project’s success extends beyond its physical achievements. Through strategic value engineering and careful project management, the construction team delivered exceptional results while reducing costs by approximately $1.5 million from the original contract value. This financial efficiency allowed the school district to redirect saved funds toward additional educational priorities.
Perhaps most impressive was the project’s early completion timeline. Recognizing the critical importance of having facilities ready for the new school year, the team accelerated key phases of construction. New classrooms were not only completed ahead of schedule but also received all necessary inspections and fire marshal approvals nearly two weeks before students returned to school.
The enhanced fine arts facilities now provide students with professional-grade spaces for music, theater, visual arts, and digital media production. Meanwhile, the upgraded CTE areas offer hands-on learning environments equipped with modern technology and industry-standard equipment. These improvements directly support the school district’s mission to prepare students for post-secondary success, whether they pursue higher education or enter the workforce directly after graduation.
The project exemplifies how thoughtful construction management can maximize educational investment while minimizing operational disruption. By completing work early and under budget, the team demonstrated that excellence in construction extends beyond meeting specifications to delivering genuine value for educational communities.
Project Facts
Industry Sector: Education
Cost: $35,000,000
Size: 182,000 SF
Delivery Method: Design-Bid-Build / Hard Bid, Construction Management
Owner: Lake Dallas ISD
Architect: VLK Architects, Inc
Let’s Build
Ready to lay the groundwork?
Find a Career
We’ve got a hard hat with your name on it.
Latest News
Looking for More?
Why Rebar Matters in Prefabricated Concrete: Strength, Durability & Best Practices with Crossland Prefab
Crossland Construction Expands in Texas with New San Marcos Office
MOmentum Bike Park Opens in Joplin: New 95-Acre Destination Built by Crossland Civil Division

