
Washington Family Hope Center Phase 2
Second-Floor Renovation: Supportive Housing for Families
Joplin, MO
In Phase 2 of this project, we transformed the second floor to support single mothers and their children, building on prior work in the same building. After demolishing old walls, ceilings, flooring, and fixtures, we created nine apartments—eight for residents and one for a monitor—with each unit featuring a combined living/bedroom space, private bath with shower, and individual heating and air. The floor also includes a large meeting room, a shared bathroom with two tubs, and a laundry room with six washers and dryers. We cleaned and repaired the exterior brick, providing a welcoming, functional, and dignified space for residents.
Project Facts
Industry Sector: Multi-Family
Cost: 1058000
Size: 8,418
Delivery Method: Negotiated
Self-Perform: Demo, Finish Carpentry, Rough Carpentry
Owner: Watered Gardens Gospel Rescue
Architect: PLJBD Architects Inc.
Engineer: McElwee Associates
Let’s Build
Ready to lay the groundwork?
Find a Career
We’ve got a hard hat with your name on it.