![Interior of Hedge Lane Pump Station plus Reservoir warehouse.](https://cdn.crossland.com/wp-content/uploads/hedge-lane-pump-station-reservior.jpg)
Hedge Lane Pump Station and Reservoir
Olathe, KS
Crossland Heavy completed the $21.4 million Hedge Lane Pump Station and Reservoir Project in Olathe, Kansas. Work included the construction of a 7.5 million gallon, below grade, a cast-in-place concrete reservoir for the storage of potable water. Additionally, crews constructed a 35 MGD pump station that is expandable to yield 75 million gallons a day and contains four adjustable, speed-driven, horizontal split case centrifugal pumping units.
The pumping station work included the placement of all cast-in-place concrete walls, exterior stone veneer, interior concrete masonry unit rooms, process piping and valves, aluminum grating and stairs, an overhead bridge crane, steel joist and decking, a thermoplastic polyolefin roof, plumbing, HVAC, and instrumentation. The exterior of the pump station included all buried piping, two cast-in-place vaults, two drainage headwalls, asphalt paving, site grading, seeding, and landscaping.
Project Facts
Industry Sector: Pump + Lift Station
Cost: $21,300,000
Self-Perform: Cast-in-Place Concrete, Process Equipment Installation
Owner: Water District No. 1 of Johnson County
Engineer: Black & Veatch
Let’s Build
Ready to lay the groundwork?
Find a Career
We’ve got a hard hat with your name on it.
Latest News
Looking for More?
Community Health: Crossland Heavy’s Environmental Impact through Wastewater Infrastructure Construction
Trace Drummond and Dalton Foster Earn National Design-Build Certification
Crossland’s Texas Division Ranks in Top 10 North Texas General Contractors by Dallas Business Journal