
Decatur WWTP Expansion
Decatur, AR
The City of Decatur selected Progressive Design-Build for their wastewater treatment plant expansion project so that they could work collaboratively with the engineer and construction manager to develop the best solutions for their specific needs within their maximum budget. The project ultimately included the construction of a new 12MGD headworks facility & influent pump station. Other work included sitework, demolition, SCADA improvements, non-potable water pump distribution system, lift stations, grading, process piping & electrical improvements. Progressive Design-Build enabled our team to assist the city with funding applications and to maximize the scope with the funds that were secured. The City of Decatur can now better support their clients and their growing community.
Project Facts
Industry Sector: Wastewater Treatment Plant
Cost: $11,491,790
Delivery Method: Design-Bid-Build / Hard Bid
Self-Perform: Below-Grade Utilities, Yard + Process Piping, Cast-in-Place Concrete, Process Equipment Installation
Owner: City of Decatur
Engineer: Allgeier, Martin and Associates, Inc.
Let’s Build
Ready to lay the groundwork?
Find a Career
We’ve got a hard hat with your name on it.
Latest News
Looking for More?
Crossland Named Wichita’s #1 Top General Contractor in the Wichita Area by The Wichita Business Journal
7 Infrastructure Priorities That Keep Manufacturing Projects Moving
Eric Lopp Named One of Kansas City’s “20 People to Know in Construction”

