Crossland Heavy Contractors performed the construction of an engine generator facility housing three 4-cycle, lean burn, 2,500 KW natural gas fueled engine generators, electrical switchgear, and control systems. Crossland Heavy performed the construction of a 7,000 square foot concrete & CMU building which will be encapsulated with a metal building set-up to resemble a horse style barn.  The 7,000 square foot building includes around 1,300 cy of concrete. Concrete work was self-performed by Crossland Heavy Contractors along with all dirt work, utilities and steel erection. The project began in July of 2015 and was completed in October of 2016.

Project facts

  • Owner - Water District NO. 1 of Johnson County
  • Engineer - Black & Veatch