Allen Road Equalization Basin

Centerton, AR

Slider imageSlider imageSlider imageSlider imageSlider image

Project Facts

Cost: $2.3M

Owner: City of Centerton

Delivery Method: Design-Bid-Build

Self-Perform: Below-Grade Utilities, Cast-in-Place Concrete

Engineer: Engineering Services Inc.

Efficient installation of a 1M-gallon equalization basin

Following improvements Crossland made to the Decatur wastewater treatment plant in Decatur, AR, the City hired Crossland Heavy to construct a cast-in-place 1,000,000-gallon equalization basin to modulate the wastewater flow coming from Centerton, AR. The project initially called for a concrete foundation with a steel tank, however during bidding, CHC secured acceptance of the cast-in-place alternative. The replacement gave CHC a competitive edge over companies without the capabilities to build such a large and complex tank structure.

Tank dimensions were: 72′ inside diameter, 34′ tall tank walls, 4′ thick foundation footings, and 2′ thick sidewalls. CHC poured the tank walls in four sections, with each pour 1-2 weeks apart. We were able to utilize our in-house formwork for 90% of the tank structure, helping recoup some of the project’s expenses, which was appreciated by the owner.

Coinciding with the concrete tank was installing new equipment, including aeration equipment inside the tank, mixing equipment, two blower units, pumps and piping in an existing lift station, and valves/operators to regulate flow to and from the new EQ Basin.

READY TO GET STARTED?

READY TO GET STARTED?

READY TO GET STARTED?

READY TO GET STARTED?

READY TO GET STARTED?

READY TO GET STARTED?

Let’s Build

Ready to lay the groundwork?

Specialty Services

Looking for info on our specialty services?