Hedge Lane Pump Station and Reservoir Project

Pump-Lift Stations
Olathe, Kansas

Hedge Lane Pump Station and Reservoir Project

Brief Summary

Crossland Heavy Contractors completed the $21.3 million Hedge Lane Pump Station and Reservoir Project in Olathe, Kansas.  Work included construction of a 7.5 million gallon, below grade, cast-in-place concrete reservoir for the storage of potable water.  Additionally, crews constructed a 30 million gallon a day pump station that is expandable to yield 75 million gallons a day and contains four adjustable, speed-driven, horizontal split case centrifugal pumping units.  The pumping station work included all cast-in-place concrete walls, exterior stone veneer, interior concrete masonry unit rooms, process piping and valves, aluminum grating and stairs, an overhead bridge crane, steel joist and decking, a TPO roof, plumbing, HVAC, and instrumentation.  The exterior of the pump station included all buried piping, two cast-in-place vaults, two drainage headwalls, asphalt paving, site grading, seeding, and landscaping.

Client — WaterOne
Cost — $21.3 million
Delivery Method — Hard Bid

Despite the challenges that arose, the Crossland Heavy project team always had an upbeat, can-do attitude and treated Olathe’s entire staff with respect.  They were responsive to our needs, respectful to our staff, effective at maintaining the schedule, and provided cost effective solutions.

-John Gilroy, City of Olathe

Project Photos

They really got the job done.  They’ve done an excellent job dealing with the schedule and weather conditions.  They have really paid attention to detail and we’re very happy with their work out there.  They are a good bunch to work with and we appreciate their great effort getting it done.

– Martin DiNitto, HOK Sport (The Project's Architect Firm)